Iron Book: heavy and odd

Heavy haul and oversize

Heavy haul trucking begins where the legal numbers end: past 102 inches wide, past the state height limit, past 80,000 lb or the axle limits. Past that line, every state on the route issues its own permit with its own rules. Here is where the line sits, and what to do with a load that is one inch over.

Updated November 2026

Flatbed load over the height limit, hatched in red above the line13 ft 6 in limit20 ft 0 in9 ft 0 in14 ft 0 in48 flat 48 ft 0 in

Where legal ends and heavy haul trucking begins

The legal lines, with sources
ItemNumberWhat it meansSourceChecked
Width102 in102 in on the National Network. Hawaii keeps 108 in. States may permit wider loads.23 CFR 658.15Nov 28, 2026
Height13 ft 6 in common, no federal limitNo federal height limit. States set their own, commonly 13 ft 6 in, some 14 ft. Check every state on the route.FHWA size guidance and each state DOTcheck your state
Gross weight80,000 lbLower where the bridge formula gives a lower figure.23 CFR 658.17(b)Nov 28, 2026
Single axle20,000 lb23 CFR 658.17(c)Nov 28, 2026
Tandem axle34,000 lbA tandem is two or more axles with centers more than 40 in and not more than 96 in apart.23 CFR 658.17(d)Nov 28, 2026
Bridge formulaW = 500 (LN / (N minus 1) + 12N + 36)W = 500 (LN / (N minus 1) + 12N + 36). W in pounds to the nearest 500, L in feet between the outer axles, N the number of axles.FHWA, Bridge Formula WeightsNov 28, 2026

Length and overhang limits vary by state and by road. Check the route.

Divisible and non-divisible loads

Most heavy haul freight is non-divisible. A divisible load can be taken apart or reduced to get under the limits: a load of steel bundles, a full trailer of pallets. A non-divisible load can't be, without destroying its use or taking more than a reasonable effort: a transformer, an excavator, a bridge beam. Overweight permits are generally only for non-divisible loads. A heavy divisible load gets lighter, or it doesn't move.

Oversize freight is too long, wide or tall for the legal lines. Overweight freight is too heavy on gross or on an axle group. One piece of oversized freight can be both, and each part needs its own permit answer.

Permits, escorts, and the rest are set by each state

Every state on the route sets its own:

  • Permit types, fees and how to apply.
  • Flags, banners and lights for over-width and overhang.
  • Escort or pilot car thresholds, front, rear or both.
  • Travel hours: daylight only, no weekends, no holidays, in many cases.
  • Routes, bridges and clearances, sometimes with a survey.

Check with each state on the route, every time. A rule from the last trip may not hold on this one.

What changes for the carrier in oversized hauling

Legal load or oversize load
Legal-size loadOversize or overweight load
PermitsNoneOne per state on the route
RoutesYour choice, within the lawSet or approved by the permit
HoursHours of service onlyHours of service plus permit hours
EscortsNoneOften, by state threshold
InsuranceYour usual coverageQuestions to ask your own agent first
TimeNormalSlower, with waiting built in

An oversized truck runs on the permit's route and the permit's hours, not the driver's.

One inch over: what to do before accepting

It happens on flatbeds and step decks all the time. The posting says 8 ft 6 in wide. The piece has a bracket. It is 103 inches.

  1. Get the widest and tallest points in writing, with how they were measured.
  2. Run the numbers on your own trailer. Deck height counts.
  3. Ask whether the piece can be turned, reloaded, or a part removed.
  4. Ask whether a step deck takes care of the height.
  5. If none of that works, it is a permit load. Either you run permitted loads, or you pass. Both are fine answers. Saying yes and hoping is not.

EXAMPLE A machine 8 ft 10 in tall on a 60 in flatbed deck: 60 plus 106 is 166 in, 13 ft 10 in. Four inches over a 13 ft 6 in limit. On a 40 in step deck: 146 in, 12 ft 2 in. Legal. The load didn't need a permit. It needed a different trailer.

For the trailers built for the heavy end, read lowboy and RGN.

General information, not legal, tax, insurance or financial advice.

Questions

What is heavy haul trucking?

Heavy haul trucking moves loads past the legal limits for weight, size or both, under permits from each state on the route. It uses specialized trailers like lowboys and RGNs, often with extra axles, plus escorts and route surveys. It is a trade of its own.

What is heavy hauling compared with a regular flatbed load?

Heavy hauling starts where a regular flatbed load stops: past 80,000 lb gross, 34,000 lb on a tandem, 102 inches wide, or the state's height limit. Inside those numbers a load runs without a permit. Past them, every state on the route has a say.

What are heavy haul loads, typically?

Heavy haul loads are typically construction and mining equipment, transformers, generators, structural steel, tanks, and large machinery: freight that can't be taken apart to get under the limits. Those are non-divisible loads, and only those qualify for overweight permits.

How to get into heavy haul trucking?

Getting into heavy haul trucking usually means specialized trailers, experience with securement for heavy pieces, insurance coverage suited to it, and learning each state's permit process. Talk to your own insurance agent about coverage before any of it. We don't dispatch specialized heavy haul.

What is oversize trucking?

Oversize trucking is moving a load that exceeds legal width, height or length. Each state sets its own permit rules, including flags, signs, lights, escorts, travel hours and routes. A load that crosses four states needs four permits and follows four sets of rules.

What about hauling oversized loads on a flatbed?

Hauling oversized loads on a flatbed is possible with permits when the freight is a bit wide or long. Most flatbed carriers stay legal-size. If a load is one inch over, the question is whether it can be reloaded, moved to a step deck, or properly permitted before you say yes.

Four short screens

Sign on your truck

We check your iron, your authority and where you like to run, then a dispatcher calls you. No setup fee. No minimums. Month to month. Cancel with 30 days notice. Fee only on loads hauled. You approve every load before it is booked.

7% one truck or new MC. 6% for 2 to 4 trucks. 5% for 5 and up. Percent of the whole invoice. No setup fee.

Sign on